StageConcept
ScaleProject cost (passport): USD 6.7 million · planned capacity 7.1 MW
01

Opportunity

A diversion hydropower scheme in Kemin District is described as a new development, combining water conveyance infrastructure with electricity generation.

02

Potential participation

Potential roles:

  • Equipment supplier: hydromechanical and electrical plant equipment.
  • Designer: hydraulic structures and generation equipment integration.
TechnologyEquipment

Source note

Information from the supplied materials; the project has not been independently verified.